Tuesday 26 August 2014

Thomas-On-Sea Updates

As some may have been aware, there were issues with the previously 'completed' layout, which required immediate attention. They layout was stripped and a rebuild started. The layout is the same in construction (2 running loops with docks controlled separately,) however some scenic alterations will be made to break it up visually. This is primarily the addition of extra buildings in the centre, which will help to fill up the void that was previously there. A lighthouse has also been added to the beach.

With just over a month until it is exhibited at the Tring Model Railway Clb's TaD-Rail exhibition, the layout is finally nearing completion once more. Once completed, new photographs will be added to the relevant pages to show the modifications that have been made.

Owen